Delivering Excellence!Small or large, simple or complex, DV is committed to excellence We Champion the Bold to Achieve the Extraordinary Our Services Featured Projects Infrastructure CONSTRUCTION OF 220KV DOUBLE CIRCUIT TRANSMISSION LINE FROM AFGHANISTAN BORDER TO HERAT CITY PHASE Infrastructure TA-9396 AFG: Second Support for Infrastructure Investments and Policy – Third Party Monitoring (51173-001) Consultancy Sanitation Concept Study for the City of Kabul Jointly financed through Afghanistan Urban Water Supply and Sewerage Corporation and German Financial Cooperation through KfW, Frankfurt, Germany. Consultancy TA-9396 AFG: Second Support for Infrastructure Investments and Policy – 03 Third Party Monitoring to review the impact of Land Acquisition and Resettlement (LAR) (51173-001) Consultancy Third-Party Monitoring (TPM) Firm to support the Ministry of Public Health (MOPH) in the implementation of the Emergency Assistance for COVID-19 Pandemic Response for Afghanistan Consultancy Site Identification of Samangan Cement Plant Establishment Infrastructure Sub-projects of Stage B of the Tranche 1 of Afghanistan Energy Sector: Subproject 3: 220 kV Mazar IPP Transmission Line Project (From Kodebarq Mazar Independent Power Plant (IPP) or Mazar IPP to existing Sheberghan-Mazar transmission line) (12 km). (Prepare of Initial Environmental Examination (IEE) report, Land Acquisition Resettlement Plan, Land Acquisition Resettlement Framework (LARF), Resettlement Action Plan (LAP)) Consultancy Engineering Field Surveys and Irrigation Schemes Designs in Kabul, Kapisa, Ghor and Herat Provinces (Kabul & Herat Regions) FACEBOOK twitter Tweets by @https://twitter.com/Dynamic_VisionA Youtube
Infrastructure CONSTRUCTION OF 220KV DOUBLE CIRCUIT TRANSMISSION LINE FROM AFGHANISTAN BORDER TO HERAT CITY PHASE
Infrastructure TA-9396 AFG: Second Support for Infrastructure Investments and Policy – Third Party Monitoring (51173-001)
Consultancy Sanitation Concept Study for the City of Kabul Jointly financed through Afghanistan Urban Water Supply and Sewerage Corporation and German Financial Cooperation through KfW, Frankfurt, Germany.
Consultancy TA-9396 AFG: Second Support for Infrastructure Investments and Policy – 03 Third Party Monitoring to review the impact of Land Acquisition and Resettlement (LAR) (51173-001)
Consultancy Third-Party Monitoring (TPM) Firm to support the Ministry of Public Health (MOPH) in the implementation of the Emergency Assistance for COVID-19 Pandemic Response for Afghanistan
Infrastructure Sub-projects of Stage B of the Tranche 1 of Afghanistan Energy Sector: Subproject 3: 220 kV Mazar IPP Transmission Line Project (From Kodebarq Mazar Independent Power Plant (IPP) or Mazar IPP to existing Sheberghan-Mazar transmission line) (12 km). (Prepare of Initial Environmental Examination (IEE) report, Land Acquisition Resettlement Plan, Land Acquisition Resettlement Framework (LARF), Resettlement Action Plan (LAP))
Consultancy Engineering Field Surveys and Irrigation Schemes Designs in Kabul, Kapisa, Ghor and Herat Provinces (Kabul & Herat Regions)