Related Projects

Sub-projects of Stage B of the Tranche 1 of Afghanistan Energy Sector: Subproject 3: 220 kV Mazar IPP Transmission Line Project (From Kodebarq Mazar Independent Power Plant (IPP) or Mazar IPP to existing Sheberghan-Mazar transmission line) (12 km). (Prepare of Initial Environmental Examination (IEE) report, Land Acquisition Resettlement Plan, Land Acquisition Resettlement Framework (LARF), Resettlement Action Plan (LAP))

Sub-projects of Stage B of the Tranche 1 of Afghanistan Energy Sector: Subproject 3: 220 kV Mazar IPP Transmission Line Project (From Kodebarq Mazar Independent Power Plant (IPP) or Mazar IPP to existing Sheberghan-Mazar transmission line) (12 km). (Prepare of Initial Environmental Examination (IEE) report, Land Acquisition Resettlement Plan, Land Acquisition Resettlement Framework (LARF), Resettlement Action Plan (LAP))

Farah – Nimroz Transmission Line & Substation Project field survey, conceptual design, Environmental Examination (IEE) report, Land Acquisition Resettlement Plan, Land Acquisition Resettlement Framework (LARF), Resettlement Action Plan (LAP)) preparations, financial and economic assessment of the project by preparing the financial and economic model for the substation and transmission line.

Farah – Nimroz Transmission Line & Substation Project field survey, conceptual design, Environmental Examination (IEE) report, Land Acquisition Resettlement Plan, Land Acquisition Resettlement Framework (LARF), Resettlement Action Plan (LAP)) preparations, financial and economic assessment of the project by preparing the financial and economic model for the substation and transmission line.

Helmand – Urozgan Transmission Line & Substation Project field survey, conceptual design, Environmental Examination (IEE) report, Land Acquisition Resettlement Plan, Land Acquisition Resettlement Framework (LARF), Resettlement Action Plan (LAP)) preparations, financial and economic assessment of the project by preparing the financial and economic model for the substation and transmission line.

Helmand – Urozgan Transmission Line & Substation Project field survey, conceptual design, Environmental Examination (IEE) report, Land Acquisition Resettlement Plan, Land Acquisition Resettlement Framework (LARF), Resettlement Action Plan (LAP)) preparations, financial and economic assessment of the project by preparing the financial and economic model for the substation and transmission line.

Urozgan – Daykundi Transmission Line & Substation Project field survey, conceptual design, Environmental Examination (IEE) report, Land Acquisition Resettlement Plan, Land Acquisition Resettlement Framework (LARF), Resettlement Action Plan (LAP)) preparations, financial and economic assessment of the project by preparing the financial and economic model for the substation and transmission line.

Urozgan – Daykundi Transmission Line & Substation Project field survey, conceptual design, Environmental Examination (IEE) report, Land Acquisition Resettlement Plan, Land Acquisition Resettlement Framework (LARF), Resettlement Action Plan (LAP)) preparations, financial and economic assessment of the project by preparing the financial and economic model for the substation and transmission line.

For More Projects Click on Projects

Projects

Regional Power Transmission Interconnection Project Performance, compliance, technical audit of the transmission line and distribution project

LOCATION

Kabul, Afghanistan

CLIENT

Ministry of Energy and Water (MEW) and Asian Development Bank (ADB)

DURATION OF ASSIGNMENT

Three Months

}

START DATE / COMPLETION DATE

Mar/2015 – May/2015

The Regional Power Transmission Interconnection Project (RPTIP) was one of the key projects which DV has done the technical audit of the mentioned project. The project was audited both financially and in technical to assure compliance with MEW and Donor requirements.