Related Projects

Sub-projects of Stage B of the Tranche 1 of Afghanistan Energy Sector: Subproject 3: 220 kV Mazar IPP Transmission Line Project (From Kodebarq Mazar Independent Power Plant (IPP) or Mazar IPP to existing Sheberghan-Mazar transmission line) (12 km). (Prepare of Initial Environmental Examination (IEE) report, Land Acquisition Resettlement Plan, Land Acquisition Resettlement Framework (LARF), Resettlement Action Plan (LAP))

Sub-projects of Stage B of the Tranche 1 of Afghanistan Energy Sector: Subproject 3: 220 kV Mazar IPP Transmission Line Project (From Kodebarq Mazar Independent Power Plant (IPP) or Mazar IPP to existing Sheberghan-Mazar transmission line) (12 km). (Prepare of Initial Environmental Examination (IEE) report, Land Acquisition Resettlement Plan, Land Acquisition Resettlement Framework (LARF), Resettlement Action Plan (LAP))

Farah – Nimroz Transmission Line & Substation Project field survey, conceptual design, Environmental Examination (IEE) report, Land Acquisition Resettlement Plan, Land Acquisition Resettlement Framework (LARF), Resettlement Action Plan (LAP)) preparations, financial and economic assessment of the project by preparing the financial and economic model for the substation and transmission line.

Farah – Nimroz Transmission Line & Substation Project field survey, conceptual design, Environmental Examination (IEE) report, Land Acquisition Resettlement Plan, Land Acquisition Resettlement Framework (LARF), Resettlement Action Plan (LAP)) preparations, financial and economic assessment of the project by preparing the financial and economic model for the substation and transmission line.

Helmand – Urozgan Transmission Line & Substation Project field survey, conceptual design, Environmental Examination (IEE) report, Land Acquisition Resettlement Plan, Land Acquisition Resettlement Framework (LARF), Resettlement Action Plan (LAP)) preparations, financial and economic assessment of the project by preparing the financial and economic model for the substation and transmission line.

Helmand – Urozgan Transmission Line & Substation Project field survey, conceptual design, Environmental Examination (IEE) report, Land Acquisition Resettlement Plan, Land Acquisition Resettlement Framework (LARF), Resettlement Action Plan (LAP)) preparations, financial and economic assessment of the project by preparing the financial and economic model for the substation and transmission line.

Urozgan – Daykundi Transmission Line & Substation Project field survey, conceptual design, Environmental Examination (IEE) report, Land Acquisition Resettlement Plan, Land Acquisition Resettlement Framework (LARF), Resettlement Action Plan (LAP)) preparations, financial and economic assessment of the project by preparing the financial and economic model for the substation and transmission line.

Urozgan – Daykundi Transmission Line & Substation Project field survey, conceptual design, Environmental Examination (IEE) report, Land Acquisition Resettlement Plan, Land Acquisition Resettlement Framework (LARF), Resettlement Action Plan (LAP)) preparations, financial and economic assessment of the project by preparing the financial and economic model for the substation and transmission line.

For More Projects Click on Projects
Projects

SC 108901 AFG: AFG MFF Energy Supply Improvement Investment Program (Solar) Tranche 3- Environmental Specialist

LOCATION

Afghanistan
Surubi District of Kabul provinces, Afghanistan

CLIENT

Asian Development Bank (ADB)
Energy Division, CWRD
Central and West Asia Department

DURATION OF ASSIGNMENT

Three Months
}

START DATE / COMPLETION DATE

May/2017 – July/2017

To provide analytical support to the assigned energy sector project by preparing the Initial Environmental Examination (IEE) report and Environmental Management Plan. DV’s consultant will be based in ADB’s Afghanistan Resident Mission.

Detailed Tasks and/or Expected Output

The Environmental Specialist is mainly stationed in the field for the proposed assignment with some home office desk review.

  1. Liaise with the Executive Agency, to conduct initial examination of direct and indirect environmental impacts of the Project, its alternatives and associated facilities including physical impacts (air and water quality, noise and vibration, soils and wastes, etc.), ecological impacts (plants, wildlife, and protected areas), and socio-economic impacts (impacts to social environment, infrastructure, traffic, etc).
  2. Prepare a Project’s Initial Environmental Examination (IEE) report and Environmental Management Plan (EMP) following the format and contents specified in the ADB Safeguard Policy (2009) and ensure rigor in the English version;
  3. Liaise with the Executive Agency in organizing meaningful consultation with affected people and

appropriate documenting consultation processes, to ensure that vulnerable groups have sufficient opportunities to participate in consultations; and, Assist in preparing inputs to the Report and Recommendations to the President and Project Administration Manual.