Our Projects All Agriculture Audit Consultancy Infrastructure Mass Media Power and Energy Water and Irrigation Provision of Design for Mazar IPP 220kV Switchyard – 220kV Mazar IPP-ADB-018 Power and Energy Baseline Assessment for Plastic Debris flowing into Rivers and Seas of South Asia Consultancy Engineering Services for Drilling of Two Exploitation Wells in Yatimtaq Gas Field Consultancy Third Party Monitoring (TPM) Consulting Firm for Energy Sector Projects of Asian Development Bank throughout Afghanistan Power and Energy GUARANTCO TECHNICAL ADVISOR IN RELATION TO SOLAR PROJECTS IN Power and Energy Contract No: 47QRAA19D009Z to perform four US Generally Accepted Government Auditing Standards (GAGAS) financial and two close out audits of a major US-based contractor operating in Afghanistan Audit AF-MOMP-147189-CS-QCBS (NPA/MoMP/99/CS-2806/QCBS), Consulting Services for “Engineering Consultancy services for gas field facilities and gas pipeline in Afghanistan, with Phase 1 tasks includes Pre-construction surveys, developing detailed pipeline design and engineering plan, preparation environmental and social documentation, optimization of field facilities; and Phase 2 includes Project planning, management, supervision, quality assurance, technical support and training during construction” Consultancy TA-9396 AFG: Second Support for Infrastructure Investments and Policy – Third Party Monitoring (51173-001) Infrastructure Load More Loading More... You’ve reached the end of the list
Third Party Monitoring (TPM) Consulting Firm for Energy Sector Projects of Asian Development Bank throughout Afghanistan Power and Energy
Contract No: 47QRAA19D009Z to perform four US Generally Accepted Government Auditing Standards (GAGAS) financial and two close out audits of a major US-based contractor operating in Afghanistan Audit
AF-MOMP-147189-CS-QCBS (NPA/MoMP/99/CS-2806/QCBS), Consulting Services for “Engineering Consultancy services for gas field facilities and gas pipeline in Afghanistan, with Phase 1 tasks includes Pre-construction surveys, developing detailed pipeline design and engineering plan, preparation environmental and social documentation, optimization of field facilities; and Phase 2 includes Project planning, management, supervision, quality assurance, technical support and training during construction” Consultancy
TA-9396 AFG: Second Support for Infrastructure Investments and Policy – Third Party Monitoring (51173-001) Infrastructure