Our Projects All Agriculture Audit Consultancy Infrastructure Mass Media Power and Energy Water and Irrigation Provision of Design for Mazar IPP 220kV Switchyard – 220kV Mazar IPP-ADB-018 Power and Energy Third Party Monitoring (TPM) Consulting Firm for Energy Sector Projects of Asian Development Bank throughout Afghanistan Power and Energy GUARANTCO TECHNICAL ADVISOR IN RELATION TO SOLAR PROJECTS IN Power and Energy AF-MOMP-147189-CS-QCBS (NPA/MoMP/99/CS-2806/QCBS), Consulting Services for “Engineering Consultancy services for gas field facilities and gas pipeline in Afghanistan, with Phase 1 tasks includes Pre-construction surveys, developing detailed pipeline design and engineering plan, preparation environmental and social documentation, optimization of field facilities; and Phase 2 includes Project planning, management, supervision, quality assurance, technical support and training during construction” Consultancy Consultancy Services for DABS Staff Capacity Building (NPA/DABS/96/CS-1754/QCBS) Consultancy Independent Engineer for 10 MW Solar PV Project at Kandahar in Afghanistan Power and Energy Provision, Delivery and Assembly of 100 KVA Transformer for the Renewable Energy Degree lab at Kandahar University Power and Energy Ghor – Herat and Ghor – Daykundi Transmission Lines & Substations Project field survey, conceptual design, Environmental Examination (IEE) report, Land Acquisition Resettlement Plan, Land Acquisition Resettlement Framework (LARF), Resettlement Action Plan (LAP)) preparations, financial and economic assessment of the project by preparing the financial and economic model for the substation and transmission line. Power and Energy Load More Loading More... You’ve reached the end of the list
Third Party Monitoring (TPM) Consulting Firm for Energy Sector Projects of Asian Development Bank throughout Afghanistan Power and Energy
AF-MOMP-147189-CS-QCBS (NPA/MoMP/99/CS-2806/QCBS), Consulting Services for “Engineering Consultancy services for gas field facilities and gas pipeline in Afghanistan, with Phase 1 tasks includes Pre-construction surveys, developing detailed pipeline design and engineering plan, preparation environmental and social documentation, optimization of field facilities; and Phase 2 includes Project planning, management, supervision, quality assurance, technical support and training during construction” Consultancy
Provision, Delivery and Assembly of 100 KVA Transformer for the Renewable Energy Degree lab at Kandahar University Power and Energy
Ghor – Herat and Ghor – Daykundi Transmission Lines & Substations Project field survey, conceptual design, Environmental Examination (IEE) report, Land Acquisition Resettlement Plan, Land Acquisition Resettlement Framework (LARF), Resettlement Action Plan (LAP)) preparations, financial and economic assessment of the project by preparing the financial and economic model for the substation and transmission line. Power and Energy